Dominion Cove Point LNG has filed a report with FERC covering construction progress at its liquefaction and LNG export terminal at Lusby, Md. through May 2016. The report states that engineering is 99.8% complete, engineered equipment procurement is 99% complete, and construction is 38% complete.

 

 