Freeport LNG Files Draft Resource Reports for Train 4 Project

Today, Freeport LNG filed draft Resource Reports 1 (General Project Description) and 10 (Alternatives) with FERC as part of the pre-filing environmental review of its Train 4 Project.  The Train 4 Project consists of the construction of a fourth gas liquefaction train, with a production capacity of approximately 5.1 million tonnes per annum, at the Freeport LNG Liquefaction Project and LNG export terminal currently under construction on Quintana Island, Texas.

 

Back to top