FERC Releases Draft EIS for Jordan Cove Energy Project’s LNG Terminal

Today, FERC released a notice of availability of the draft environmental impact statement (EIS) for Jordan Cove Energy Project’s proposed LNG export terminal near Coos Bay, Ore. and interconnected pipeline.  According to FERC’s notice, the Staff concludes that the limited adverse environmental impacts from the project would be substantially reduced with the implementation of the proposed and recommended mitigation measures specified in the draft EIS.  Comments on the draft EIS are due February 13, 2015.

Back to top