FERC to Prepare EIS for Cambridge Energy Affiliate Floating LNG Export Terminal

FERC released notice of its intent to prepare an Environmental Impact Statement (EIS) for Cambridge Energy Group Limited affiliate CE FLNG, LLC’s proposed floating liquefaction, storage and offloading LNG export terminal project located on the Mississippi River near Baptiste Collette Bayou in Plaquemines Parish, La., and the interconnected pipeline.  Comments on the scope of the EIS are due January 6, 2014.  FERC’s notice can be found here and the complete docket for the CE FLNG project can be found on eLibrary by searching for Docket No. PF13-11.

Back to top