FERC: Pre-Filing Process Not Required for Cameron LNG BOG Recapture Project

FERC has notified Cameron LNG that the Commission’s pre-filing process is not required for the planned boil-off gas (BOG) liquefaction and recapture project planned for the Cameron LNG terminal. FERC’s letter is available in the Commission’s eLibrary.

Back to top