U.S. Coast Guard Determines No Update Needed for Sparrows Point LNG WSA

Captain Mark P. O’Malley, Captain of the Port for Sector Baltimore, informed AES Sparrows Point LNG this week that no update is required at this time for the project’s Waterway Suitability Assessment (WSA). Captain O’Malley’s letter is available in the FERC eLibrary under Docket No. CP07-62.

Back to top