Eversheds Sutherland LNG Law Blog
content top

Study: Pacific Basin LNG Market Can Support West Coast Import Terminal

A study produced by ICF International for Jordan Cove LNG concludes that based on expected increases in LNG liquefaction capacity and competing import demand projections for the Pacific Basin, the market can support an LNG terminal on the West Coast of the United States. The report is available in the FERC eLibrary under Docket No....

FERC Extends Deadline for Consideration of Rehearing in Bradwood Landing LNG Proceeding

Yesterday FERC granted rehearing for further consideration in the Bradwood Landing LNG terminal proceeding. The order tolls the statutory deadline for considering timely requests for rehearing to give the Commission additional time to reach a decision regarding the requests.  FERC’s order is available in the Commission’s eLibrary under Docket No. CP06-365 and The Oregonian...

Enbridge CEO: Negotiations Moving Forward with Gazprom on Rabaska LNG Project

In an interview with the Calgary Herald, Enbridge CEO Pat Daniel said that plans to bring Gazprom into the Rabaska LNG regasification project as the terminal’s supplier and as an equity partner remain...

Port Dolphin to Survey Proposed Gas Pipeline Route

The Herald Tribune (Sarasota, Fla.) reports that Port Dolphin Energy is planning to survey and sample the ocean floor along its proposed pipeline route connecting a proposed LNG deepwater port to the mainland near Tampa...

Repairs Made To Damaged Gas Pipeline Near Cove Point LNG Terminal

The Washington Post provides details on Dominion’s efforts to repair a natural gas pipeline near the Cove Point LNG facility. The existing pipeline experienced minor damage during construction of a new pipeline extension associated with the expansion of the Cove Point LNG...

Mass. Attorney General’s Office Responds to Weaver’s Cove

The Massachusetts Attorney General’s office responded yesterday to a November 4 filing by Weaver’s Cove LNG on the issue of whether the decision by the U.S. Secretary of Commerce to sustain Massachusetts’ objection to the project’s consistency with the state’s Coastal Zone Management Plan should prevent FERC from issuing further approvals for the proposed...

« Older Entries Next Entries »